solution

Recent news

Mehr Housing Projects – Prand city

In order to make practical the industrial construction of houses, Aras poulad have represented its technical abilities by making tunnel formworks in two great residential projects in Parand city. Mass industrial construction of residential building in the form of “Mehr housing project” attracted contractors and the formwork of this company has been applied in these projects. The value of the contracts is about 20.000.000 $.

 Pardis new City

- Participating in providing 450 m3 concrete per day for construction of Pardis project in 2010

 

- constructing 10 floors building using tunnel form method applying the full equipment

- May be you have seen movies about disappearance of people or things (vanishing). Recently scientists o f Saint Andrews University have discovered new material “Metaflex” which is able to control the lights at a fundamental levels. The ability of changing light behavior to Meta materials envisions the disappearance.

 

metaflex1

metaflex2

-    The highest building “Khalife Tower” is in Emirates. Here is the specification of this structure:

828 meters height, 330.000 sqm. Concrete in 39000 Tones structure, 526.760 sqm area, the horizon of view 95kms. Expenses 1.5 million dollars.

-    Do you know about the subject 19 of national manual? You can go through the site to learn about it without any charges http://sinza.blogfa.com

 

 

 rahehal

 

postbullets Tall Buildings                 

postbullets Dam 

postbullets Tunnels 

postbullets Stadium

 

  

  

 customer

 

postbullets technical advice  

 

postbullets After-sales services      

 

 

academi

 

postbullets Articles           

postbullets Publications 

postbullets Conferences                 

postbullets R&D